Day

February 16, 2021
These two projects demonstrate the flexibility of Fluid Lift Gasification™ and the creativity of the Ecoremedy engineering team. The two drawings below reflect a vertical vs. horizontal layout for the same ECR-542 system (14,250 WT/Y).   Vertical Installation The Edmonds Project, located in Washington state, will be a vertically-oriented two-story installation in an existing incinerator...
Continue Reading